Review Agenda Item
Meeting Date: 5/18/2022 - 3:30 PM
Category: Consent Calendar
Type: Action
Subject: 11.15 BUILDING AND GROUNDS: Ratification of Change Order #28-011 for Bid Category 28 - Roadway Engineering and Contracting, Incorporated for the Liberty High School Project (funded through Various Facilities Funds in the amount of $6,966.39, not the General Fund)
Strategic Plan:
Enclosure
File Attachment:
Roadway CO #28-011 .pdf
Summary: The Board of Trustees previously approved, and the District has undertaken the facilities project known as the Liberty High School Project, which consists of constructing a complete comprehensive high school. On March 20, 2019, the Board of Trustees approved the contract with Roadway Engineering & Contracting Inc. in the amount of $5,252,500 for all services related to offsite work, including the Scott and Leon Interchange, the construction of Wicker and Garbani Road, traffic signals, and all work around the perimeter of the Liberty High School campus. During trenching for the streetlights around the Liberty campus, significant rock outcroppings were discovered along the conduit pathways. Breaking of this rock was necessary to install the electrical conduit and the installation of streetlights around the campus. District staff directed Roadway to proceed on a time and material basis to remove the rock in these pathways. The work necessary to complete the installation of the conduit and the lights was completed at a cost of $6,966.39.

This is being brought before the Board as ratification due to the need to mitigate schedule impacts related to installing the conduit pathways and light poles around the Liberty High School campus.
Funding: The cost for this item is included in the 2021-22 operating budget funded through Various Facilities Funds, not the General Fund.
Recommendation: It is recommended that the Board of Trustees ratify Change Order #28-011 for Bid Category 28 - Roadway Engineering and Contracting, Incorporated for the Liberty High School Project.
Approvals:
Recommended By:
Signed By:
Hector Gonzalez - Director of Facilities
Signed By:
Sylvia Hinojosa - Director - Purchasing
Signed By:
Candace Reines - Deputy Superintendent
Signed By:
Grant Bennett - Superintendent
Vote Results:

Original Motion
Member Dr. Jose Luis Araux Moved, Member Dr. Randall Freeman seconded to approve the Original motion 'It is recommended that the Board of Trustees ratify Change Order #28-011 for Bid Category 28 - Roadway Engineering and Contracting, Incorporated for the Liberty High School Project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0.
The motion Carried 4 - 0
   
David Nelissen     Yes
Dr. Randall Freeman     Yes
Dr. Jose Luis Araux     Yes
Elizabeth Vallejo     Yes