Subject:
11.25 BUILDING AND GROUNDS: Agreement With Kira Construction for the Heritage High School Greenhouse Repair Project (funded through the Routine Restricted Maintenance Fund in the amount of $59,487.24, not the General Fund)  
Strategic Plan:
 
Enclosure:
 
File Attachment:
Kira Construction Heritage Greenhouse.pdf
 
Summary:
The Heritage High School Agricultural Research Center (ARC) was completed on the Heritage High School (Heritage) Campus in 2012. This facility includes a greenhouse building. The District has identified the need to conduct repairs to the greenhouse facility. Over time the greenhouse has deteriorated and is in need of repairs to the metal building structure, building siding and roof polycarbonate panels, evaporative cooling system, building controls, doors, and door jambs, and repairs to the planting benches, which are located within the building. The greenhouse is a vital part of the agriculture program at Heritage and, as such, needs these repairs to continue servicing the students that make up the agriculture program. A proposal was received for this work from Kira Construction. The work to repair the greenhouse at Heritage will be done at a cost of $59,487.24.  
Funding:
The cost for this item is included in the 2022-23 operating budget funded through the Routine Restricted Maintenance Fund, not the General Fund.  
Recommendation
It is recommended that the Board of Trustees approve the Agreement with Kira Construction for the Heritage High School Greenhouse Repair Project.  
Approvals:
Recommended By:
Signed By:
Hector Gonzalez - Director of Facilities
Signed By:  
Sylvia Hinojosa - Director - Purchasing
Signed By:  
Candace Reines - Deputy Superintendent
Signed By:  
Grant Bennett - Superintendent
 
Vote Results:

Original Motion
Member Dr. Jose Luis Araux Moved, Member Dr. Randall Freeman seconded to approve the Original motion 'It is recommended that the Board of Trustees approve the Agreement with Kira Construction for the Heritage High School Greenhouse Repair Project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
David Nelissen     Yes
Dr. Jose Luis Araux     Yes
Anthony T. Stafford, Sr.     Yes
Dr. Randall Freeman     Yes
Elizabeth Vallejo     Yes